

And here's what she looks like today as a work in progress.

What we've done:
• Replaced the mint green tiles with subway tile.
• Ripped out the green marble linoleum flooring. (Thank goodness!)
• Added bead board.
What's left to do:
• Add the bullnose trim border around the subway tile. It will be black.
• Replace the toilet. (You don't even want to see what it looked like before!)
• Add the basecap trim.
• Paint the trim and beadboard white.
• Paint the walls Laura Ashley Apple 3. (See photo below)
• Put down new tile floor. (See photo below)
• Replace the light fixture
• Put the mirror back in place.

This little bathroom is going to be a gem when she's done! I can't wait to have one room complete!
1 comment:
Looks GREAT! I love a WIP!! love, mom
Post a Comment