BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
Gone are the cracked plaster walls, the linoleum tile floors, the nasty stained toilet, the awkwardly placed lighting, the exposed pipes, and the poorly built framework around the tub.
They've been replaced with new sheet rock and crown molding, tile floors, a sparkling new toilet, farmhouse style light fixtures (and a recessed light in the ceiling with a fan to pull out the moisture), plumbing that runs under the floor, and new tile and framework around the tub.
Here's some detail of the tile work. I love the sweet little pearl accents.
Can't wait to have visitors...
2 comments:
Looks great. I know you're glad to have that done!
Looks awesome! Love the details! Do I get to use that bathroom when I come visit?
Post a Comment